ECEdge

Exam: GATE 2027 exams are on 6, 7, 13, 14, 20 and 21 February 2027. Official GATE 2027 site

Physical design and STA

Turn a netlist into a real chip layout that meets timing, power and area.

You run floorplanning, placement, clock tree synthesis and routing, then fix timing and power problems until the chip is ready for fabrication.

0 of 20 topics doneMake a progress card
Turning a netlist into a chip layout FloorplanPlacementClock treeRouting Pads (I/O) Standard cells Clock tree Metal wires The clock treereaches everyflip-flop at once.
A die with its pads, rows of cells, wires and a balanced clock tree.

At a glance

Jobs this leads to

  • Physical Design Trainee
  • Junior Physical Design Engineer
  • STA Engineer
  • Physical Verification (DRC/LVS) Engineer
  • Layout Engineer
  • CAD / Tcl Scripting Engineer

How long it takes

12–18 months alongside college. New to the basics? Start with the foundation and tick what you already know.

Getting in as a fresher

Most B.Tech freshers enter through physical verification, STA, layout, or PD trainee roles at semiconductor service firms.

Full guide: how freshers get into physical design trainee jobs

Who hires, and the skills this path uses

Who hires

Tessolve, MosChip, HCLTech, Wipro, Capgemini Engineering, eInfochips (Arrow), L&T Technology Services (LTTS), Mirafra Technologies, SmartSoC, Wafer Space, Sankalp Semiconductor (HCLTech), Quest Global, UST, Signoff Semiconductors, Soctronics.

Skill mix

How much each skill matters, rated 1 to 5 by us.

Programming2/5 Maths2/5 Circuit theory3/5 Hands-on hardware1/5 Exam-style theory3/5

The route

  1. CMOS and digital basics5 topics
  2. Static timing analysis5 topics
  3. Place and route flow5 topics
  4. Signoff and physical verification5 topics
  5. Job-ready for
    • Physical Design Trainee
    • Junior Physical Design Engineer
    • STA Engineer

Open a stage to see its topics and resources. Tick a topic when you can explain it to a friend without notes.

Understand what a standard cell is and why wires slow chips down.

0 of 5 doneBadge earned

Topics to learn

Beginner project

Hand-calculate the delay of an inverter chain and compare with a SPICE run.

Best free resources

Read a timing report and fix a violation.

0 of 5 doneBadge earned

Topics to learn

Intermediate project

Write SDC for a two-clock design and fix a setup violation in OpenSTA.

Best free resources

Run a full RTL-to-GDS flow with open-source tools.

0 of 5 doneBadge earned

Topics to learn

Advanced project

Take a small Verilog design through OpenLane on the SKY130 process and get a clean GDS.

Best free resources

  • Course
    VLSI Design Flow: RTL to GDS (NPTEL) by Prof. Sneh Saurabh, IIIT DelhiEnd-to-end flow with Yosys, OpenSTA and OpenROAD demos. Exam certificate is paid and optional.
  • Course
    VLSI Physical Design (NPTEL) by Prof. Indranil Sengupta, IIT KharagpurAlgorithms behind floorplanning, placement, CTS and routing.
  • Tool
    LibreLane by FOSSi FoundationOpen-source RTL-to-GDS flow, the active successor to OpenLane 2.
  • Tool
    OpenROAD by The OpenROAD ProjectThe place-and-route engine under LibreLane.
  • Course
    Foundation – Physical Design by Maven SiliconFree intro course. Sign-up needed.

Know what must pass before a chip goes to the factory.

0 of 5 doneBadge earned

Topics to learn

Capstone project

Write a Tcl script that reports the worst 10 paths and summarises them in a table.

Best free resources

  • Guide
    SkyWater SKY130 PDK docs by SkyWater, Google and FOSSiReal design and antenna rules from an open 130 nm process.
  • Tool
    Magic VLSI by Open Circuit DesignLayout editor, DRC checker and parasitic extractor.
  • Tool
    Netgen by Open Circuit DesignLVS tool that compares layouts against schematics.
  • Tool
    KLayout by Matthias KöfferleinFast GDS viewer and editor with DRC and LVS scripting.
  • Official
    Tiny Tapeout by Tiny TapeoutFree tapeout guides and GDS flow. Fabrication costs money.